The Drax Power (Generating Stations) Order 2019

2019 No. 1315

Infrastructure Planning

The Drax Power (Generating Stations) Order 2019

Made 4th October 2019

Coming into force 25th October 2019

An application under section 37 of the Planning Act 20081(“the 2008 Act”) has been made to the Secretary of State for an order granting development consent.

The application has been examined by the Examining Authority appointed by the Secretary of State pursuant to Chapter 2 of Part 6 of the 2008 Act. The examination was carried out in accordance with Chapter 4 of Part 6 of the 2008 Act and the Infrastructure Planning (Examination Procedure) Rules 20102. The Examining Authority has submitted a report and recommendation to the Secretary of State under section 74 of the 2008 Act.

The Secretary of State has considered the report and recommendation of the Examining Authority, has considered the environmental information in accordance with regulation 4 of the Infrastructure Planning (Environmental Impact Assessment) Regulations 20173and has had regard to the documents and matters referred to in section 104(2) of the 2008 Act.

The Secretary of State, having decided the application, has determined to make an order giving effect to the proposals comprised in the application on terms that in the opinion of the Secretary of State are not materially different from those proposed in the application.

Accordingly, the Secretary of State, in exercise of the powers conferred by sections 114, 115 and 120 of the 2008 Act, makes the following Order—

1 PRELIMINARY

PART 1

PRELIMINARY

S-1 Citation and commencement

Citation and commencement

1. This Order may be cited as the Drax Power (Generating Stations) Order 2019 and comes into force on 25th October 2019.

S-2 Interpretation

Interpretation

2.—(1) In this Order—

the 1961 Act” means the Land Compensation Act 19614;

the 1965 Act” means the Compulsory Purchase Act 19655;

the 1980 Act” means the Highways Act 19806;

“the 1981 Act” means the Compulsory Purchase (Vesting Declarations) Act 19817;

the 1984 Act” means the Road Traffic Regulation Act 19848;

“the 1990 Act” means the Town and Country Planning Act 19909;

“the 1991 Act” means the New Roads and Street Works Act 199110;

the 2008 Act” means the Planning Act 200811;

“access and rights of way plans” means the plans of that name identified in the Table 17in Schedule 14 (documents and plans to be certified) and which are certified by the Secretary of State as the access and rights of way plans for the purposes of this Order;

“address” includes any number or address used for the purposes of electronic transmission;

“AOD” means above ordnance datum;

“AGL” means above ground level;

“apparatus” has the same meaning as in Part 3 of the 1991 Act except that it further includes pipelines (and parts of them), aerial markers, cathodic protection test posts, field boundary markers, transformer rectifier kiosks, electricity cables, telecommunications equipment and electricity cabinets;

“authorised development” means the development and associated development described in Schedule 1 (authorised development) which is development within the meaning of section 32 of the 2008 Act;

“book of reference” means the document of that name identified in the table in Schedule 14 and which is certified by the Secretary of State as the book of reference for the purposes of this Order;

“building” includes any structure or erection or any part of a building, structure or erection;

“carbon capture readiness reserve space” means the area comprised in Work No. 10 shown on the works plans;

“carriageway” has the same meaning as in the 1980 Act;

“the CHP statement” means the document of that name identified in the table in Schedule 14 and which is certified by the Secretary of State as the CHP statement for the purposes of this Order;

“commence” means carry out a material operation, as defined in section 155 of the 2008 Act (which explains when development begins), comprised in or for the purposes of the authorised development other than the permitted preliminary works (except where stated to the contrary) and “commencement”, “commenced” and cognate expressions are to be construed accordingly;

“commissioning” means the process of assuring that all systems and components of each of numbered works 1A and 2A (which are installed or whose installation is near to completion) are tested to verify that they function and are operable in accordance with the design objectives, specifications and operational requirements of the undertaker and “commission” and other cognate expressions, in relation to numbered works 1A and 2A, are to be construed accordingly;

“compulsory acquisition notice” means a notice served in accordance with section 134 of the 2008 Act;

“date of Work No. 1A full commissioning” means the date on which the commissioning of numbered work 1A is completed as notified by the undertaker to the relevant planning authority pursuant to Requirement 4(2) of Schedule 2;

“date of Work No. 2A full commissioning” means the date on which the commissioning of numbered work 2A is completed as notified by the undertaker to the relevant planning authority pursuant to Requirement 4(3) of Schedule 2;

“design parameters” means the parameters set out in Schedule 13 (design parameters)

“Drax Power Limited” means Drax Power Limited (Company Registration Number 04883589) whose registered office is at Drax Power Station, Selby, North Yorkshire YO8 8PH;

“Electricity Acts” means the Electric Lighting Act 190912, the Electricity (Supply) Act 191913and the Electricity Act 198914;

“electronic transmission” means a communication transmitted—

(a) by means of an electronic communications network; or

(b) by other means but while in electronic form;

“the environmental statement” means the document of that name identified in the table in Schedule 14 and which is certified by the Secretary of State as the environmental statement for the purposes of this Order;

“the flood risk assessment” means the document of that name identified in the table in Schedule 14 and which is certified by the Secretary of State as the flood risk assessment for the purposes of this Order;

“footpath” and “footway” have the same meaning as in the 1980 Act;

“highway” and “highway authority” have the same meaning as in the 1980 Act;

“the land plans” means the plans of that name identified in the table in Schedule 14 and which are certified by the Secretary of State as the land plans for the purposes of this Order;

“limits of deviation” means the limits of deviation shown for each work number on the works plans;

“maintain” includes inspect, repair, adjust, alter, remove, refurbish, reconstruct, replace and improve any part of, but not remove, reconstruct or replace the whole of, the authorised development provided that any such activities do not give rise to any materially new or materially different environmental effects which are worse than those assessed in the environmental statement and “maintenance” and “maintaining” are to be construed accordingly;

“NGET” means National Grid Electricity Transmission plc (Company Registration Number 02366977) whose registered office is at 1 to 3 Strand, London, WC2N 5EH;

“NGG” means National Grid Gas plc (Company Registration Number 02006000) whose registered office is at 1 to 3 Strand, London WC2N 5EH;

“Order land” means the land delineated and marked as such on the land plans;

“Order limits” means the limits shown on the works plans within which the authorised development may be carried out;

“the outline construction environmental management plan” means the document of that name identified in the table in Schedule 14 and which is certified by the Secretary of State as the outline construction environmental management plan for the purposes of this Order;

“the outline construction traffic management plan” means the document of that name identified in the table in Schedule 14 and which is certified by the Secretary of State as the outline construction traffic management plan for the purposes of this Order;

“the outline construction worker travel plan” means the document of that name identified in the table in Schedule 14 and which is certified by the Secretary of State as the outline construction worker travel plan for the purposes of this Order;

“the outline landscape and biodiversity strategy” means the document of that name identified in the table in Schedule 14 and which is certified by the Secretary of State as the outline landscape and biodiversity strategy for the purposes of this Order;

“the outline public right of way management plan” means the document of that name identified in the table in Schedule 14 and which is certified by the Secretary of State as the outline public right of way management plan for the purposes of this Order;

“the outline surface water drainage strategy” means the outline surface water drainage strategy in section 6.0 of the flood risk assessment;

“owner”, in relation to land, has the same meaning as in section 7 of the Acquisition of Land Act 198115;

“permitted preliminary works” means all or any of—

(a) environmental surveys, geotechnical surveys, intrusive archaeological surveys and other investigations for the purpose of assessing ground conditions, demolition of buildings and removal of plant and machinery;

(b) above ground site preparation for temporary facilities for the use of contractors;

(c) the provision of temporary means of enclosure and site security for construction;

(d) the temporary display of site notices or advertisements; or

(e) site clearance (including vegetation removal, demolition of existing buildings and structures);

“Planning Acts” means the Town and Country Planning Act 194716, the Town and Country Planning Act 196217, the Town and Country Planning Act 197118, and the 1990 Act;

“plot” means the plots listed in the book of reference and shown on the land plans;

“relevant planning authority” means the district planning authority for the area...