The Abergelli Power Gas Fired Generating Station Order 2019

JurisdictionUK Non-devolved
CitationSI 2019/1268
Year2019

2019 No. 1268

Infrastructure Planning

The Abergelli Power Gas Fired Generating Station Order 2019

Made 19th September 2019

Coming into force 10th October 2019

An application under section 37 of the Planning Act 20081(the “2008 Act”) has been made to the Secretary of State for an order granting development consent.

The application has been examined by a single appointed person appointed by the Secretary of State pursuant to Chapter 3 of Part 6 of the 2008 Act and carried out in accordance with Chapter 4 of Part 6 of the 2008 Act and the Infrastructure Planning (Examination Procedure) Rules 20102. The single appointed person has submitted a report and recommendation to the Secretary of State under section 83 of the 2008 Act3.

The Secretary of State, has considered the report and recommendation of the Examining Authority, has taken into account the environmental information in accordance with regulation 3 of the Infrastructure Planning (Environmental Impact Assessment) Regulations 20094and has had regard to the documents and matters referred to in section 104(2) of the 2008 Act.

The Secretary of State, having decided the application, has determined to make an order giving effect to the proposals comprised in the application.

In accordance with section 127 of the 2008 Act5, the Secretary of State has applied the relevant tests and is satisfied that they have been met.

Accordingly, the Secretary of State, in exercise of the powers in sections 114, 115, and 120 of the 2008 Act, makes the following Order—

1 PRELIMINARY

PART 1

PRELIMINARY

S-1 Citation and commencement

Citation and commencement

1. This Order may be cited as the Abergelli Power Gas Fired Generating Station Order 2019 and comes into force on 10th October 2019.

S-2 Interpretation

Interpretation

2.—(1) In this Order—

the 1961 Act” means the Land Compensation Act 19616;

the 1965 Act” means the Compulsory Purchase Act 19657;

the 1980 Act” means the Highways Act 19808;

“the 1984 Act” means the Road Traffic Regulation Act 19849;

the 1986 Act” means the Gas Act 198610

“the 1989 Act” means the Electricity Act 198911

“the 1990 Act” means the Town and Country Planning Act 199012;

“the 1991 Act” means the New Roads and Street Works Act 199113;

“the 2008 Act” means the Planning Act 200814;

“Abergelli Power Limited” means Abergelli Power Limited (Company No. 8190497) whose registered office is at Drax Power Station, Drax, Selby, United Kingdom, YO8 8PH;

“address” includes any number or address used for the purposes of electronic transmission;

“apparatus” has the same meaning as in Part 3 of the 1991 Act;

“authorised development” means the development described in Schedule 1 (authorised development) which is development within the meaning of section 32 of the 2008 Act;

“book of reference” means the book of reference with submission document reference number 4.3 and which is certified by the Secretary of State as the book of reference for the purposes of this Order;

“building” includes any structure or erection or any part of a building, structure or erection;

“carriageway” has the same meaning as in the 1980 Act;

“commence” means beginning to carry out any material operation, as defined in section 155 of the 2008 Act (which explains when development begins), comprised in or carried out for the purposes of the authorised development other than operations consisting of environmental surveys and monitoring, investigations for the purpose of assessing ground conditions (including investigations necessary for the discharge of requirements 14 (site investigation), 15 (mineral resources survey) and 16 (peat management plan)) receipt and erection of construction plant and equipment, erection of any temporary means of enclosure associated with and for the duration of the other works excluded from this definition of commence, the temporary display of site notices or advertisements and the words “commencement” and “commenced” and cognate expressions are to be construed accordingly;

“commissioning” means the process of testing all systems and components of the authorised development (which are installed or in relation to which installation is near complete) in order to ensure that they, and the authorised development as a whole, functions in accordance with the plant design specifications and the undertaker’s operational and safety requirements;

“date of completion of construction” means the date on which the construction of the authorised development is complete including rectification of any construction defects, landscaping and reinstatement works;

“date of final commissioning” means the date on which the authorised development commences operation by generating power on a commercial basis but excluding the generation of power during commissioning;

“design principles statement” means the design principles statement with submission document reference number 10.2 and certified as such by the Secretary of State for the purposes of this Order;

“electronic transmission” means a communication transmitted—

(a) by means of an electronic communications network; or

(b) by other means but while in electronic form;

“environmental statement” means the environmental statement submitted with submission document reference numbers 6.1, 6.2, 6.3, 6.4.0 and which is certified as such by the Secretary of State for the purposes of this Order;

“exhaust gas emission flue stack” means the exhaust gas emission flue stack including ancillary support structures, sound proof cladding, and emissions monitoring platforms;

“footpath” and “footway” have the same meaning as in the 1980 Act;

“flood consequences assessment” means the flood consequences assessment contained in appendix 9.1 of the environmental statement and certified as the flood consequences assessment by the Secretary of State for the purposes of this Order;

“gas turbine generator” means one gas turbine which drives a single electricity generator for the purposes of generating electricity including air inlet filter house, air inlet duct, exhaust diffuser, and auxiliaries such as lube oil system, air dryers, fuel gas filter package, instrument air system and compressor washing;

“gross rated electrical output” means the aggregate of gross electrical power as measured at the terminals of the generator in accordance with standards agreed with the regulating authority under the Environmental Permitting (England and Wales) Regulations 201615;

“hedgerow plan” means the hedgerow plan with submission document reference 2.9 and which is certified as the hedgerow plan by the Secretary of State for the purposes of this Order;

“highway” and “highway authority” have the same meaning as in the 1980 Act;

“land plans” means the plans with submission document reference number 2.2 and which are certified as the land plans by the Secretary of State for the purposes of this Order;

“limits of deviation” means in respect of numbered works 1, 2 and 3 the outer limits of the corresponding numbered area shown on the works plans;

“maintain” includes inspect, repair, adjust, alter, remove, refurbish, reconstruct, replace and improve any part, but not the whole of, the authorised development but only insofar as such activities are unlikely to give rise to any materially new or different environmental effects from those assessed in the environmental statement and for the avoidance of doubt “maintain” shall not entitle the undertaker to remove or reconstruct the whole of work no. 1, and “maintenance” and “maintaining” are to be construed accordingly;

“National Grid” has the definition set out in paragraph 18 of Schedule 11 to this Order;

“Order land” means the land which is required for, or is required to facilitate, or is incidental to, or is affected by, the authorised development shown on the land plans and described in the book of reference;

“Order limits” means the limits shown on the works plans;

“outline construction environment management plan” means the outline construction environment management plan revision 2 which is certified as the outline construction environmental management plan by the Secretary of State for the purposes of this Order;

“outline construction staff travel plan” means the outline construction staff travel plan contained in appendix 3.3b of the environment statement and which is certified as the outline construction staff travel plan by the Secretary of State for the purposes of this Order;

“outline construction traffic management plan” means the outline construction traffic management plan contained in appendix 3.3a of the environmental statement and which is certified as the outline construction traffic management plan by the Secretary of State for the purposes of this Order;

“outline drainage strategy” means the outline drainage strategy revision 1 which is certified as the outline drainage strategy by the Secretary of State for the purposes of this Order;

“outline landscape and ecological mitigation strategy” means the outline landscape and ecological mitigation strategy revision 4 which is certified as the outline landscape and ecological mitigation strategy by the Secretary of State for the purposes of this Order;

“outline lighting strategy” means the outline lighting strategy contained in appendix 3.5 of the environmental statement and which is certified as the outline lighting strategy by the Secretary of State for the purposes of this Order;

“outline surface water management plan” means the outline surface water management plan in appendix 3.2 of the environmental statement and which is certified as the outline surface water management plan by the Secretary of State for the purposes of this Order;

“owner”, in relation to land, has the same meaning as in section 7 of the Acquisition of Land Act 198116;

“relevant planning authority” means the City and County of Swansea Council in relation to land in its area;

“requirements” means those matters set out in Schedule 2 to this Order;

“rights of...