Livestock Rearing Land Improvement Grants (Standard Costs) Regulations, 1960

JurisdictionUK Non-devolved
CitationSI 1960/930
Year1960

1960 No. 930

The Livestock Rearing Land Improvement Grants (Standard Costs) Regulations, 1960

25thMay 1960

31stMay 1960

7thJune 1960

The Minister of Agriculture, Fisheries and Food and the Secretary of State, acting jointly, in pursuance of the powers conferred upon them by section one of the Agricultural Improvement Grants Act, 1959(a), and of all other powers enabling them in that behalf, with the consent of the Treasury, hereby make the following regulations:—

1. These regulations, which may be cited as the Livestock Rearing Land Improvement Grants (Standard Costs) Regulations, 1960, shall apply throughout the United Kingdom and shall come into operation on the 7th day of June, 1960.

2.—(1) In these regulations, unless the context otherwise requires:—

"approved" means approved by the Minister;

"the Minister" means, in relation to England and Wales or Northern Ireland, the Minister of Agriculture, Fisheries and Food, and, in relation to Scotland, the Secretary of State;

"of framed construction" means, in relation to a building, constructed in such a manner that the roof is supported on stanchions, pillars or posts independently of the walls;

"of traditional construction" means, in relation to a building, constructed in such a manner that the roof is supported on load-bearing walls;

"work" means a work of a description specified in column 1 of Part I of the First Schedule to these regulations which is carried out in accordance with the requirements set out as respects that work in column 2 of that Part of that Schedule.

(2) In these regulations, any work referred to by a number means the work so numbered in Part I of the First Schedule to these regulations; and, in relation to such a work, "requirements" means the requirements there set out as respects that work.

(3) The Interpretation Act, 1889(b), shall apply to the interpretation of these regulations as it applies to the interpretation of an Act of Parliament.

(a) 7 & 8 Eliz. 2. c. 31.

(b) 52 & 53 Vict. c. 63.

3.—(1) For the purposes of the payment of improvement grants under the Hill Farming and Livestock Rearing Acts, 1946 to 1959(a), the cost of any work carried out in accordance with an authority to start work given by the Minister after the commencement of these regulations shall, if the applicant for a grant so elects, be taken to be an amount calculated at the appropriate rate or rates specified in respect of that work in column 3 of Part I of the First Schedule to these regulations:

Provided that the amount so calculated shall, in any of the circumstances referred to in Part II of the First Schedule to these regulations, be varied in accordance with the provisions there set out relating to the circumstances.

(2) The Livestock Rearing Land Improvement Grants (Standard Costs) Regulations, 1959(b), shall not have effect as respects any work falling within paragraph (1) of this regulation.

4. Where any building or any material used in connection with any work is a building of a type or material of a kind referred to in the Second Schedule to these regulations, the building or material, as the case may be, shall conform to the general conditions therein set out in respect of such building or material.

In Witness whereof the Official Seal of the Minister of Agriculture, Fisheries and Food is hereunto affixed this twentieth day of May, nineteen hundred and sixty.

John Hare, Minister of Agriculture, Fisheries and Food.

(L.S.)

Given under the Seal of the Secretary of State for Scotland this twenty-third day of May, nineteen hundred and sixty.

John S. Maclay, Secretary of State for Scotland.

(L.S.)

We consent this twenty-fifth day of May, nineteen hundred and sixty.

R. Brooman-White, J. D. Gibson-Watt, Two of the Lords Commissioners of Her Majesty's Treasury.

(a) 9 & 10 Geo. 6. c. 73; 14 & 15 Geo. 6. c. 18; 2 & 3 Eliz. 2. c. 23; 4 & 5 Eliz. 2. c. 72; 7 & 8 Eliz. 2. c. 31.

(b) S.I. 1959/1556 (1959 I, p. 168).

FIRST SCHEDULE

PART I

Where any rate set out in this Part of this Schedule in respect of any work is a rate per unit of measurement, any fraction of a unit shall be disregarded for the purpose of calculating the cost of that work.

In this Part of this Schedule the expression "floor area" means—

(a) in relation to work 4, the floor area between the outside edges of the stanchions;

(b) save as aforesaid, in relation to a building, the internal floor area.

 Work Requirements Rate
                 Column 1 Column 2 Column 3
                 BUILDINGS £ s. d
                 1. Totally enclosed general The building shall have a Per square foot of floor area
                 purpose building of tradi- minimum width of 15′ 0″. (a) where the height between
                 tional construction. Adequate doors, windows floor and and eaves is
                 and roof lights shall be less than 12′ 0″ but
                 provided in accordance not less than 8′ 0″
                 with the needs of the (i) for the first 1,000
                 building. square feet … … 13 6
                 (ii) for the next 2,000
                 square feet … … 10 0
                 (iii) for the next 2,000
                 square feet … … 8 6
                 (iv) thereafter … … 7 0
                 (b) where the height between
                 floor and eaves is less
                 than 14′ 0″ but not less
                 than 12′ 0″
                 (i) for the first 1,000
                 square feet … … 16 3
                 (ii) for the next 2,000
                 square feet … … 11 0
                 (iii) for the next 2,000
                 square feet … … 9 0
                 (iv) thereafter … … 8 6
                 (c) where the height between
                 floor and eaves is less
                 than 16′ 0″ but not less
                 than 14′ 0″
                 (i) for the first 1,000
                 square feet … … 17 9
                 (ii) for the next 2,000
                 square feet … … 11 6
                 (iii) for the next 2,000
                 square feet … … 9 6
                 (iv) thereafter … … 9 3
                 (d) where the height between
                 floor and eaves is not
                 less than 16′ 0″
                 (i) for the first 1,000
                 square feet … … 19 3
                 (ii) for the next 2,000
                 square feet … … 12 0
                 (iii) for the next 2,000
                 square feet … … 9 9
                 (iv) thereafter … … 9 6
                 2. Totally enclosed general The building shall have a Per square foot of floor area
                 purpose building of framed minimum width of 15′ 0″. (a) where the height between
                 construction. Adequate doors, windows floor and eaves is less
                 and roof lights shall be than 12′ 0″ but not less
                 provided in accordance than 8′ 0″
                 with the needs of the (i) for the first 1,000
                 building. square feet … … 12 3
                 (ii) for the next 2,000
                 square feet … … 8 0
                 (iii) for the next 2,000
                 square feet … … 7 0
                 (iv) thereafter … … 6 0
                 (b) where the height between
                 floor and eaves is less
                 than 14′ 0″ but not less
                 than 12′ 0″
                 (i) for the first 1,000
                 square feet … … 15 3
                 (ii) for the next 2,000
                 square feet … … 8 3
                 (iii) for the next 2,000
                 square feet … … 8 0
                 (iv) thereafter … … 7 6
                 (c) where the height between
                 floor and eaves is less
                 than 16′ 0″ but not less
                 than 14′ 0″
                 (i) for the first 1,000
                 square feet … … 16 9
                 (ii) for the next 2,000
                 square feet … … 8 6
                 (iii) for the next 2,000
                 square feet … … 8 3
                 (iv) thereafter … … 8 0
                 (d) where the height between
                 floor and eaves is not
                 less than 16′ 0″
                 (i) for the first 1,000
                 square feet … … 18 3
                 (ii) for the next 2,000
                 square feet … … 9 0
                 (iii) for the next 2,000
                 square feet … … 8 6
                 (iv) thereafter … … 8 3
                 3. Open-fronted building of The building shall have a Per square foot of floor area
                 traditional construction. minimum width of 18′ 0″ (a) for the first 1,000
                 and aminimum clear square feet … … … 10 0
                 height of 8′ 0″ at the (b) for the next 2,000 square
                 open front. Adequate feet … … … … … 8 0
                 natural lighting shall (c) for the next 2,000 square
                 be provided in feet … … … … … 7 6
                 accordance with the (d) thereafter … … … 6 6
                 needs of the building
                 4. Dutch barn or covered (a) Where the frame
                 part of cattle yard or includes stanchions Per square foot of floor area
                 implement shed of, in of— (a) if stanchions are of round
                 each case, framed (i) rolled steel wood
                 construction (excluding joists, the (i) with 2 rows of
                 foundations). stanchions stanchions … 4 9
                 shall be— (ii) with 1 row of
                 (a) not less stanchions … 4 3
                 than 6′ (b) if stanchions are of any
                 × 3″ in other approved type
                 the case (i) with 2 rows of
                 of a stanchions … 5 3
                 buildings (ii) with 1 row of
                 with a stanchions … 4 9
                 span not plus for each square foot of
                 exceeding floor area in relation to one
                 21′ 0″ building
                 and a (i) not in excess of
                 height the first 1,000
                 not square feet … 9
                 exceeding (ii) exceeding 1,000
                 16′ 0″ to and not exceeding
                 the eaves; 2,500 square feet 6
                 (b) not less
                 than 7′ ×
                 4′ in the
                 case of a
                 building
                 with a
                 span
                 exceeding
                 21′ 0″ and
                 a height
                 exceeding
                 16′ 0″ but
                 not
                 exceeding
                 18′ 0″ to
                 the eaves
                 (c) not less
                 than 8′ ×
                 4′ in the
                 case of a
                 building
                 with a
                 span
                 exceeding
                 21′ 0″ and
                 a height
                 exceeding
                 18′ 0″ to
                 the eaves
                 (ii) tubular steel
                 the frame
                 shall be
                 constructed
                 in accordance
                 with an
                 approved
                 design.
                 (iii) wood, the frame
                 shall be
                 constructed
                 of sound sawn
                 wood in
                 accordance
                 with an
                 approved
                 design, or,
                 in approved
                 cases, of
                 round wood.
                 (iv) precast
                 reinforced
                 concrete,
                 the frame
                 shall be
                 constructed
                 in accordance
                 with an
                 approved
                 design.
                 (b) The frame may be
                 constructed partly
                 of one and partly
                 of another of the
                 aforementioned
                 materials in
                 accordance with an
                 approved design.
                 (c) Roof principals and
                 purlins shall be
                 included in the
                 design and shall
                 be of steel,
                 concrete, wood or
                 aluminium alloy
                 spaced at
                 distances
                 appropriate to
                 the roof covering
                 material used.
                 (d) The gable ends
                 shall be sheeted
                 down to eaves
                 level with
                 galvanised steel,
                 asbestos cement
                 or other approved
                 material.
                 5. Cowhouse. (a) The building shall Per cow
                 be of traditional (a) with feeding passage
                 or framed (i) for the first 12
                 construction and cows … … … 57 15 0
                 shall have a (ii) for the next 12
                 minimum height of cows … … … 43 10 0
                 8′ 0″ tothe eaves. (iii) thereafter … … 40 10 0
                 (b) Adequate doors, (b) without
...

To continue reading

Request your trial

VLEX uses login cookies to provide you with a better browsing experience. If you click on 'Accept' or continue browsing this site we consider that you accept our cookie policy. ACCEPT